Environmental Objectives
The Management and staff at Future Engineering are committed and will strive to:
• Provide a workplace which does not damage or have a negative impact on the environment
• Purchase environmentally friendly resources within our business
• Promote efficient use of materials and resources throughout our processes To assist in achieving these objectives we will:
• Train, educate and communicate with employee’s, contractors, customers, visitors and other interested parties regarding this policy and the expectations towards environmental protection in the workplace
• Promote environmental awareness among our employees and encourage them to work in an environmentally responsible manner
Over the Christmas period of 2017/18, our Japanese client asked us to do the impossible . We needed to fabricate, assemble, freight, install and commission a full vessel suspension system in 12 weeks to be ready for unveiling at the Yokohama boat show. We partnered with Future Engineering to complete such a time and accuracy critical job and we weren’t disappointed. Communications were excellent, project management was excellent and the mechanical swingarms and slider components were delivered with the required accuracy and on time. Everything fit together as required and we shipped out a week ahead of schedule. Our client, Yanmar Shipbuilding, were extremely impressed with our ability to deliver such as fantastic product in such a short time, and this was largely due to the efforts of Future Engineering. Alina, Pepi, Alex and their team delivered on what they promised and we never felt nervous or apprehensive about the schedule. On top of that, they were the most cost effective quote we got. It really inspires my confidence to bid on bigger and more audacious projects when I know a supplier like Future Engineering “has my back” Dr Laurie Walker General Manager Nauti-craft
Dr Laurie Walker General Manager Nauti-craftOur Relationship has spanned over 9 years and during the last 4 years Future Engineering have been actively drriving to improve their quality management systems and have obtained quad certification ISO 9001:2015, ISO 14001:2015, OHSAS 18001:2007 & AS/NZS 4801:2001 which has been fully backed and driven by the Managing Director and the QA Manager of Future Engineering and has been fully embraced with all their staff. This is a significant step in how the business now operates and works with their customers to achieve product quality and delivery Product quality and lead-times are critical factors in our market and as such Peak Well Systems work closely with Future Engineering to ensure there is a clear understanding of contract requirements and thus maintaining full compliance to all contracts I orders awarded. By working closely together we have reduced lead-times and costs ensuring that we gain a stronger competitive edge in what is an extremely difficult market. We were recently working together on a very large contract and meticulous end to end planning and coordination was required by both Peak Well Systems and Future Engineering to meet a very tight delivery deadline. This order was delivered to the programs agreed delivery schedule and with zero quality issues. During our 9-year partnership with Future Engineering, our relationship has gone from strength to strength and both companies work on a fully transparent basis and ensure there are clear and open lines of communication making it so much easier in daily business and especially at times where priorities can and do change, ensuring there are no late deliveries or quality issues for the customer. Future Engineering strive on achieving their KPI's and take pride in how their business is conducted and at all times are focused on their customers John Toshack Global Supply Chain Manager Peak Well Systems
John ToshackSpeno Rail Maintenance have been a long term customer of Future Engineering for approximately 20 years. During this time, we have completed many large projects not limited to but including; Mini Grinders, Switch Trolleys, Grinding Trains, Ultrasonic Trolleys for fault detection, wheel replacements and many refurbishments to existing machinery. Future Engineering has constantly shown outstanding services from assistance in design and technical recommendations to manufacture and fabrication including various surface treatments and safety requirements required by each individual project. Over the many years of service we have noted Future Engineering has been driven in constantly improving, by expanding Workshop space but also with the increase of CNC machinery incorporating new technology to allow a higher turnover of components ensuring shorter lead times with a very high quality. Future Engineering has obtained Quad Certification of our management systems to ISO 9001:2015, ISO 14001:2015, OHSAS 18001:2007 & AS/NZS 4801:2001 showing a commitment to ensuring high standards. Speno Rail requires a supplier to have great flexibility and understanding of urgency. We have found Future Engineering understands our requirements and ensures our deliveries are met. With committed Management and Staff they have proven to be an asset to Speno Rail Maintenance. Justin Tysoe Speno Rail Maintenance
Justin Tysoe Speno Rail Maintenance